1) 3 Position Clean (Hang, Low Hang, Floor) start at 60% and work to 80% then drop back down to 65% and work up to a max
2) Clean Pulls 1 x 3 (95%) 3 x 2 (100%)
3) "11.5"
20 min AMRAP
5 Power Clean (145/100)
10 TTB
15 Wallballs (20/14)
4) Accumulate 25 Strict C2B + 30 HSPU
No comments:
Post a Comment